Quality Control
Mechanical parts testing
Parts
From material to final products, Our machine process strict quality control system to guarantee the quality to customer`s hands, belows are every steps of quality control from single parts fabrication to finished machine.

PLC configures testing

Accuracy testing

Ground conduction testing

Insulation testing & Non-Load currect testing
Aging testing

Lasting our : 24hrs
Working condition: Normal
Testing aim: Intensive work to test the machine performance and check every parts condition after testing
Appearance detection
Key part assembling inspection
Key parts accurancy
Whole apperance checking
Electric performance Test
Currency testing

Cylinder testing

Ground conduction test

Insulated resistance test

Power-Frequency Test

Stress testing

Testing report

Company Profile
Chengdu Xingweihan Welding Equipment Co., Ltd.